Trail Maintenance

Almost every year, GDTA trail crews conduct trail maintenance on the GDT. Projects can include building, maintaining and improving trail tread, removing fallen trees, repairing and building trail structures, brushing and clearing vegetation, as well as blazing and signing the trail.

Below are summaries of past GDTA Trail Maintenance trips. If you are interested in participating in one of our future Trail Maintenance trips, check out our GDTA Volunteer Guide or contact us at greatdividetrail@gmail.com


High Rock Trail – 2017

The GDTA Trail Crew in The North Face jackets

By Doug Borthwick This year, we increased our work on the High Rock Trail significantly, expanding to multiple scouting and trail building trips throughout the summer. A huge amount was accomplished thanks to the large number of hard-working and dedicated volunteers. Some of the key accomplishments in 2017: 27 km …

Continue reading

High Rock Trail – 2016

Cutting the ribbon on the first new section of the GDT in 30 years!

From July 20-24, 2016, the Great Divide Trail Association sent in our largest crew ever to begin construction of the first new section of the GDT in thirty years. 26 hard-working volunteers worked to clear the forested corridor, establish tread and flag future trail in what will become the High …

Continue reading

Owen Creek to Pinto Lake – 2015

The highest point on the GDT

After an amazing signature trail maintenance trip on the Aldridge Creek Trail in BC, five keen volunteers continued the trail maintenance spree on the Alberta side of the Divide from July 22-25. The small, but enthusiastic crew hiked for four days from Owen Creek Canyon to Pinto Lake and out …

Continue reading

Aldridge Creek – 2015

The GDTA Volunteer Trail Crew

From July 15-19, the Great Divide Trail Association partnered with the Hornaday Wilderness Society, the trail operator for the Aldridge Creek Trail. 18 volunteers worked to re-establish the trail from the Aldridge Creek trailhead to Fording River Pass, repairing and building trail tread, and removing brush and fallen trees. [Photos …

Continue reading

Hidden Creek – 2014

Building trail

Twenty-one volunteers spent four days (July 24 to 27, 2014) working to repair damage to the Great Divide Trail caused by the June 2013 floods and re-established the trail from Tornado Saddle to the ridge crest north of Hidden Creek. Two bridges over South Hidden Creek were built, trail and …

Continue reading

The Flood of 2013

Unfortunately due to road and trail damage from the severe flooding in south-western Alberta in June 2013, our 2013 GDT Trail Maintenance trip was cancelled. From August 30 to September 1, 2013, three members of the Great Divide Trail Association hiked from Hidden Creek to Baril Creek, assessing damage to …

Continue reading

Etherington Creek – 2012

Fifteen volunteers spent four days camped on the north fork of Etherington Creek.  A bridge over the main fork of Etherington Creek was built and the trail was reconstructed through the difficult cut-block section leading toward Baril Creek. This work was originally planned for 2011, but logistic issues required it …

Continue reading

Lost Creek – 2010

This year’s planned trail maintenance in the Lost Creek area has been successfully completed.  Sixteen people took part in a four-day weekend of brush clearing, branch pruning, trail re-alignment and re-blazing.  The goal of completing trail maintenance south to where last year’s work ended was accomplished.

Upper Oldman – 2009

The Trail Crew

Major trail work took place during July 2009.  A newly formed volunteer group dedicated to the ongoing maintenance of the GDT, the Friends of the Great Divide Trail, spearheaded the effort by recruiting new volunteers, obtaining permits from the Alberta Government, and arranging for donations of food and the loan …

Continue reading

Baril Creek – 2006

Cornwell-cirque

In September 2006, members of the Great Divide Trail Association and the Alberta Wilderness Association, with help from several Pathway Connectivity employees, did bridge construction across Baril Creek and trail clearing up to Fording River Pass.  The entire Baril access trail was also re-blazed.